References since 2016:

Wärmeprozesstechnik GmbH – Germany

2016 to date: TOE (TakeOff Engineering) adapted WS-flameless oxydation burner technology with ultra-low NOX emissions for application in the global chemical industry:

  • Presented the adapted FLOX-technology on the European Ethylen Producers Conference in Dresden/2017 and on the AICHe Spring Meeting in Orlando/2018
  • Techno-economic qualifcation of technology for application in ethyleneplant cracking furnaces
  • Development of firmprice proposal jointly with LINDE and WS for conversion of 8 cracking furnace at BAZAN group in Haifa Israel. (EPC-contract pending)

Air Products – USA:

2019 to date: TOE supports AP with project development of a Methanol to Olefin project in Uzbekistan:

  • Feasibility study & techno-economic assessment completed
  • Currently in Frontend Engineering (FEED) phase
  • Business case development

Haldor Topsoe – Denmark:

2017 -2018: TOE supported project development and risk assessment for HAT-gas processing solutions for landfill & bio digester markets. (Example of a canadian landfill project with wastegas to methanol plant)

Islam Oxygen – Bangladesh:

2020: TOE supports technically and commercially the Air Separation Plant (ASP) provider Medoxygen for an ASP-project in Dakhar.

Bilfinger SE – Germany:

July 2017 to march 2019: Bilfinger Engineering & Technology Division: >10 different legal entities covering the 6 vertical market segments Engergy conventional & nuclear, Petrochemical, Oil & Gas, Pharma & Food, Cement, Metallurgy. TOE consulted Bilfinger SE in business development along these 6 vertical market segments.

  • 2018 to march 2019: TOE developped so-called value propositions within verticals with project opportunities of more than 500m€ total order intake
  • Developped a customizes quantified risk assessment tool for projects
  • Developped an EPC-competence center supporting the Bilfinger legal entities for complex EPC-projects (matrix organisation with dotted line and shared P&L- responsibility)
  • Developped marketing concept for Bilfinger market segments incl. vertical brochures and websites

 

Bilfinger BNG – Germany:

March 2019 to date: TOE supports the development and market introduction of the Bilfinger technology FLAREPOWER for the conversion of sourgases to synthetic gypsum as an alternative to Claus-plants. Specific project development on firm price basis for OMV-Rumania. (other customer interested like Kuwait Petroleum, Saudi Aramco, Wintershall)

Bilfinger Westcon – USA:

2018: TOE conducted risk assessment for mechanical construction project in La Porte/Texas for Braschem polypropylene plant.

Bilfinger – UK:

2018: TOE conducted a risk assessment study for the Bilfinger project Sludge Conversion to Synthesisgas with Greenergy Pyrolysis technology for Thames Waters.

 

Green hydrogen production plants for refueling stations – Germany:

2020: TOE develops projects with biogas fueled steam reforming technology for green hydrogen production in conformity with the green hydrogen strategy of the German government. TOE aims for such projects to be realized on a commercial project finance basis.